< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=614450593712233&ev=PageView&noscript=1" /> No.1 Customer Case - Jiangyin Uzone International Trade Co., Ltd.

No.1 Customer Case

LOGO23

NO.1 CUSTOMER CASE

First encounter with customers at the exhibition

First encounter with customers at the exhibition

we have been following an American brand manufacturer for two years and haven't reached a deal, because they have fixed suppliers. At an exhibition, their boss came to our place and told us they had an urgent project. The product needs to be customized and delivered within one month. Usually, the time period from product development, mold building, sampling to the final product would take 45 days at least. Besides, this customer also needs special crafts. After considering the feasibility of this plan, our boss took over this challenging project.

When the project began, we drew 2D and 3D drawings within one hour based on a sketch of the customer. We sent the drawings to the customer and after receiving the confirmation, we started opening the mold, sampling,polishing and producing immediately. At each stage, we mobilized all the resources to ensure the whole project goes smoothly.

3D sample

3D sample

Finished product

Finished product

In the water polishing process, a small amount of water entered the bottle during the cleaning process, leaving water stains in the drying process, which was discovered during our quality inspection. We arranged staff at once to clean it overnight and finally delivered to the customer on time and with perfect quality.

DEISGN TEAM

3D DESIGN

3D DESIGN

HAND DRAWN SKETCH

HAND DRAWN SKETCH

PROFESSIONAL ARTIST

PROFESSIONAL ARTIST

QUALITY CONTROL TEAM

Uzone Group Workshop-4
Uzone Group Workshop-3
Uzone Group Workshop-5

Welcome to contact us!